AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Interesante

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

Logo with a stylized "S" and the text "Spotty Streaming Energy" in bold, yellow font on a black background.

Socios

Using dynamic electricity tariffs for heat – with Spotty

Discover how to optimize heat generation with dynamic electricity tariffs with my-PV and Spotty – with or without PV.

Leer más...
Winery in South Tyrol with solar panels on the roof a gravel parking area in front a garden and vineyards beside it

Referencia

Cambio energético en la bodega: del gas a la fotovoltaica en Tirol del Sur

La bodega Carlotto Ferruccio usa ahora energía solar en vez de gas, también para agua caliente – una apuesta por la sostenibi

Leer más...
Row houses feature solar panels on the roofs balconies and a garden shed with a German flag standing in one garden

Referencia

Un proyecto escolar lleva calefacción solar a una casa adosada

Agua caliente de una solución fotovoltaica independiente en lugar de calefacción a gasoil, una alternativa económica.

Leer más...