AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Interesante

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

reduxi Logo

Socios

Reduxi ahora compatible con my-PV

Agua caliente inteligente con excedente PV: Reduxi compatible con dispositivos my-PV.

Leer más...
Five white my-PV company cars in front of the building with wooden facade, logo, and solar panels.

Empresa

Coches eléctricos en my-PV

Vemos el futuro no solo en la tecnología de edificios (solar-)eléctrica, sino también en el ámbito de la movilidad.

Leer más...
Aerial view of my-PV building with solar panels on roof and facade, visible logo, and cars in the parking lot.

Empresa

Activación del núcleo de hormigón en el edificio de la empresa – Informe anual 2024

Cómo nuestro edificio solar-eléctrico de la empresa destaca en su tercer año a pesar de los altos costos de electricidad

Leer más...