AC•THOR 9s – Operation with 3 single-phase heating elements
Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.
The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.
CAUTION:
This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!
The following instructions from the operating manual are important:
Solution
The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).
Interesante
Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!
More articles
Socios
Reduxi ahora compatible con my-PVAgua caliente inteligente con excedente PV: Reduxi compatible con dispositivos my-PV.
Leer más...Empresa
Coches eléctricos en my-PVVemos el futuro no solo en la tecnología de edificios (solar-)eléctrica, sino también en el ámbito de la movilidad.
Leer más...Empresa
Activación del núcleo de hormigón en el edificio de la empresa – Informe anual 2024Cómo nuestro edificio solar-eléctrico de la empresa destaca en su tercer año a pesar de los altos costos de electricidad
Leer más...