ETHERMA und myPV News
|Servicio técnico

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Interesante

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

A two-story building with solar panels on the roof, featuring large windows and a red roof. A person walks by in the foreground.

Referencia

Agua caliente para un internado en Kenia

Durante años, los 50 niños se ducharon con agua fría. Ahora, my-PV ofrece calefacción autónoma.

Leer más...
Tablet displaying graphs on a desk beside a pen and notebook, with "New Prices effective July 1, 2026" text overlay. Bright office background.

Empresa

Nuevos precios para los productos my-PV vigentes desde el 1 de julio de 2026

Debido al aumento de los costos de personal, materiales y producción, es necesario ajustar los precios.

Leer más...

Empresa

my-PV sigue creciendo: Philipp Baumgartner refuerza la expansión internacional

Con una dirección ampliada, my-PV se prepara para su próxima fase de crecimiento.

Leer más...