AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Wist u dat?

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

Bedrijf

Nieuwe my-PV Setup-app vereenvoudigt ingebruikname

De “my-PV Setup” app detecteert apparaten op het lokale netwerk en vereenvoudigt de ingebruikname van my-PV-oplossingen.

Lees meer...

Algemeen

my-PV breidt trainingsaanbod in Nederland en België uit

Door de groeiende vraag naar slimme PV-warmte breidt my-PV zijn trainingen voor installateurs in Nederland en België uit.

Lees meer...

Partner

Compatibiliteit met Carlo Gavazzi is uitgebreid

Compatibiliteit met Carlo Gavazzi, een langdurige partner van my-PV, omvat nu extra elektriciteitsmeters.

Lees meer...