ETHERMA und myPV News
|Ondersteuning

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Wist u dat?

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

A two-story building with solar panels on the roof, featuring large windows and a red roof. A person walks by in the foreground.

Referenties

Warm water voor een internaat in Kenia

Jarenlang doucheden de 50 kinderen koud. my-PV levert nu autonome verwarming.

Lees meer...
Tablet displaying graphs on a desk beside a pen and notebook, with "New Prices effective July 1, 2026" text overlay. Bright office background.

Bedrijf

Nieuwe prijzen voor my-PV-producten per 1 juli 2026

Door stijgende personeels-, materiaal- en productiekosten is een prijsaanpassing nodig.

Lees meer...
Logo for Intersolar Europe, featuring the words "inter solar" in yellow and "connecting solar business" and "EUROPE" in smaller text.

Algemeen

my-PV bij Intersolar 2026

Van 23 tot 25 juni 2026 zal Intersolar Europe in München opnieuw haar deuren openen – en my-PV zal er ook zijn.

Lees meer...