Kompatible Partner News
|Références

Reference project without stagnation

A 9.6 kWp photovoltaic system on the roof, 4-person household and a buffer tank of 1,000 liters: these were the parameters of our reference project based in Germany. Besides, a customer was annoyed by a non-functioning solar thermal system (keyword stagnation problem). The new wish: A contemporary photovoltaic-supported system that focuses on self-use or self-consumption of the excess photovoltaic yields rather than feeding into the grid.

Taking advantage of an already existing 1,000 liters buffer storage tank, the photovoltaic power to heat had to be applied with optimal thermal stratification along with the immersion heaters. The solution was an electrothermal hydraulic unit from Tuxhorn, one of our compatibility partners. This hydraulic unit controls circulation through a variable speed pump and integrated temperature differential logic.

The precise power modulation of where energy is used and when, is handled by the AC•THOR 9s. Only through this intelligent and linear powered photovoltaic power manager makes an electric heat generation suitable for the use of excess solar power. Linear power is therefore especially important because the photovoltaic output is also constantly changing throughout the day.

Reference project (German)

More articles

reduxi Logo

Partenaires

Reduxi désormais compatible avec my-PV

Eau chaude intelligente avec surplus PV : Reduxi compatible avec les appareils my-PV.

lire la suite...
Five white my-PV company cars in front of the building with wooden facade, logo, and solar panels.

L'entreprise

Voitures électriques chez my-PV

Nous voyons l’avenir non seulement dans la technologie du bâtiment (solaire-)électrique, mais aussi dans le domaine de la mob

lire la suite...
Aerial view of my-PV building with solar panels on roof and facade, visible logo, and cars in the parking lot.

L'entreprise

Activation du noyau en béton dans le bâtiment de l'entreprise - Rapport annuel 2024

Notre bâtiment solaire-électrique : 3e année, coûts élevés mais performance assurée

lire la suite...