ETHERMA und myPV News
|Supporto

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Cose da sapere

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

reduxi Logo

Partner

Reduxi ora compatibile con my-PV

Acqua calda intelligente con surplus PV: Reduxi ora compatibile con i dispositivi my-PV.

Leggi di più...
Five white my-PV company cars in front of the building with wooden facade, logo, and solar panels.

Azienda

Auto elettriche presso my-PV

Vediamo il futuro non solo nella tecnologia degli edifici (solare-)elettrici, ma anche nel settore della mobilità.

Leggi di più...
Aerial view of my-PV building with solar panels on roof and facade, visible logo, and cars in the parking lot.

Azienda

Attivazione del nucleo in calcestruzzo nell’edificio aziendale – Rapporto annuale 2024

Come il nostro edificio aziendale solare-elettrico continua a impressionare nel terzo anno nonostante l’aumento dei costi del

Leggi di più...