AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Cose da sapere

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

Partner

Ampliamento della rete di partner con la piattaforma software Enixi

al team11:02Claude hat geantwortet: my-PV amplia la rete di partner con enixi, specialista nella fatturazione per comunit

Mehr lesen...
A two-story building with solar panels on the roof, featuring large windows and a red roof. A person walks by in the foreground.

Referenze

Acqua calda per un convitto in Kenya

Per anni i 50 bambini si sono lavati con acqua fredda. Ora my-PV fornisce riscaldamento autonomo.

Mehr lesen...
Tablet displaying graphs on a desk beside a pen and notebook, with "New Prices effective July 1, 2026" text overlay. Bright office background.

Azienda

Nuovi prezzi per i prodotti my-PV in vigore dal 1º luglio 2026

A causa dell’aumento dei costi di personale, materiali e produzione, è necessario adeguare i prezzi.

Mehr lesen...