ETHERMA und myPV News
|Ondersteuning

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Wist u dat?

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

White two-story stucco house with small porch, paved courtyard and outbuildings under a blue sky.

Referenties

Oude Ierse boerderij getransformeerd tot een door zonne-energie aangedreven woning.

Onafhankelijkheid met de SOL•THOR: autonome warmwaterproductie op een voormalige Ierse boerderij.

Lees meer...
Wood-paneled building facade with a balcony-mounted array of solar panels, two windows and potted plants at the base.

Algemeen

Gebruik de energie van je balkonpaneel zelf in plaats van deze weg te geven!

Vier varianten laten zien dat warmte zelfs bij een 2 kWp balkonpaneel essentieel kan zijn voor maximale opbrengst.

Lees meer...
A house with solar panels on the roof, surrounded by greenery and neighboring homes, with a small trailer parked in the yard.

Referenties

Fotovoltaïsche warmte in twee varianten voor warm water en verwarming

Een netgekoppeld en een autonoom PV-systeem produceren in het Zwarte Woud warm water en ondersteunen de verwarming.

Lees meer...