ETHERMA und myPV News
|Généralités

Support AC•THOR / AC•THOR s Firmware a Changes

Support: AC•THOR / AC•THOR 9s Firmware a0020410 changes

  • All signal sources, including those that were previously only selectable via the web interface, can now be set on the display.
  • The frequency mode is no longer a separate operating mode. Instead, frequency control can be selected as a signal source. Thus, the operating modes M1 to M7 can now be used in AC off-grid systems.
  • A firmware update on a unit in "M8 frequency mode" automatically switches it to "M1 hot water" operating mode and "frequency" is set as the signal source.
  • New signal source "Fronius Gen24 Manual" added.
  • Correction for operating mode M7. The PWM output signal works correctly again.
  • The heat pump operating mode M4 can now also be used if no meter value is known at the feed-in point. The power specifications, e.g. via Modbus TCP, are sufficient information for the control.
  • The combination with charging columns from KEBA and Eaton is now also possible if no meter value is known at the feed-in point. The power specifications, e.g. via Modbus TCP, are sufficient as information for the control.
  • Further information here:/(German)
  • Optimising the data connection with my-PV.LIVE
  • Here you will find the latest

More articles

Généralités

Smart meter rollout in Benelux region on track – my-PV offers compatible solutions

From 2025 it is necessary for every PV homeowner in Flanders to replace analog with digital meter.

lire la suite...

L'entreprise

Review of Intersolar 2025

For my-PV, Intersolar 2025 was a great success. The topic of photovoltaic heat is currently attracting significant interest.

lire la suite...

Généralités

Mesures de la Belgique contre le surplus d’électricité photovoltaïque – les solutions my-PV sont prêtes pour l’avenir

Mesures de la Belgique face au surplus d’électricité photovoltaïque – les solutions my-PV sont prêtes pour l’avenir.

lire la suite...