Heating with the sun

Renovated single-family house in Austria

Two large heat storage tanks are heated during the day with the own photovoltaic power via two 9 kW immersion heaters.

Faits sur le projet

Client/Owner/Planner:
Type of building:
Year of construction:
Size:
Photovoltaic power, orientation:
Heat storage size:
Used my-PV product:
System control by/with:
Stoeger PV Projekt

Customer statement

The family lived in this bungalow until its enlargement and renovation in 2021. A 5.5 kWp photovoltaic system had already been installed on it before, and the AC•THOR 9s from my-PV used surplus energy to load the two 1,000 liter buffer tanks.

Even before the photovoltaic system was enlarged, the client Markus Stöger, himself a specialist in high-quality electronics, created the right conditions in his hydraulic heating system for the planned system expansion. For example, by installing two 9 kW screw-in heaters, the subsequent increase in photovoltaic heat generation capacity was already considered from the outset.

With over 35 kWp of installed photovoltaic power, it is now a true solar power plant that naturally provides immense excess power. These surpluses from the photovoltaic system can be used sensibly on site for heat generation thanks to my-PV's solutions, instead of being unprofitably fed into the grid.

In the new 18 kW operating mode, two electric heating elements are supplied with surplus power from the photovoltaic system. One of them can be controlled continuously, the second one is switched on as soon as sufficient surplus is available.

Since both 9 kW heating rods were already available, the effort to upgrade the photovoltaic heating was limited to the installation of a three-pole relay and a minimal adjustment in the wiring. The necessary firmware update for the AC•THOR 9s was simply imported by my-PV via the Internet. All AC•THOR 9s already installed by our customers can also be made suitable for this operating mode by updating the software.

In addition to the surplus detection at the house connection point by means of my-PV Power Meter, Markus Stöger uses (as an optional extra) a second my-PV Power Meter for power measurement at the switched heating rod. Thus, this consumption is also shown in the power display on the display and on the web interface and can also be taken into account in the energy recording of the data logger.

Enormous advantages for the customer

The AC•THOR 9s has been in use in the new operating mode since summer 2021. By mid-November, it had not been necessary to heat up the biomass heating system even once, and this despite the fact that the existing high-temperature heating system with radiators was retained on the first floor during the refurbishment.

The immediate economic benefits are already obvious. The costs for the chimney sweep have been significantly reduced and the storage space required for logs has also been massively reduced. Both in front of the building and inside it. In the future, the family will have an entire basement room at its disposal, once the existing firewood stocks have been used up. Whether this will happen in the coming winter is highly questionable, however, because the heating season for the Stöger family has now been reduced to the months of December and January thanks to photovoltaic heating from my-PV.

Opinion personnelle du client et résumé

In this operating mode, it is expressly recommended that both the AC•THOR 9s control and the power measurement at the switched load are each carried out with a my-PV Power Meter!

Stöger PV Projekt von oben
my-PV PowerMeter
Stoeger PV Projekt 2
my-PV AC THOR 9s
Stoeger PV Projekt
PV Projekt

Weitere Referenzprojekte

Eau chaude grâce à l'électricité photovoltaïque plutôt qu'au gaz pour le club de football

Utilisation de l'électricité photovoltaïque excédentaire du toit pour la production d'eau chaude à l'ATSV Neuzeug.

lire la suite...

Poêle de masse et chaleur photovoltaïque au lieu de pompe à chaleur

La maison individuelle impressionne par sa construction écologique et sa technologie de chauffage innovante.

lire la suite...

,

Le trio d’appareils my-PV atteint 98 % d'autoconsommation PV

Grâce à un AC ELWA 2 et deux AC ELWA-E, un propriétaire en Estonie a atteint un taux d'autoconsommation de 98 %.

lire la suite...

Une Maison Individuelle avec de Nombreux Partenaires Compatibles

Optimisez votre énergie photovoltaïque grâce à la compatibilité des systèmes : découvrez comment cette maison y est parvenue.

lire la suite...

3 modules photovoltaïques pour l'eau chaude

Une installation photovoltaïque de 1,4 kWp produit de l'eau chaude en été avec la ELWA, économisant 1 m³ de gaz par jour.

lire la suite...

Une famille suisse augmente son autoconsommation

Le fabricant suisse de logiciels Solar Manager contrôle l'AC•THOR 9s dans une maison individuelle dans le canton d'Aargau.

lire la suite...