Renovated single-family house in Austria

Two large heat storage tanks are heated during the day with the own photovoltaic power via two 9 kW immersion heaters.

Faits sur le projet

Client/Owner/Planner:
Type of building:
Year of construction:
Size:
Photovoltaic power, orientation:
Heat storage size:
Used my-PV product:
System control by/with:
Stoeger PV Projekt

Customer statement

The family lived in this bungalow until its enlargement and renovation in 2021. A 5.5 kWp photovoltaic system had already been installed on it before, and the AC•THOR 9s from my-PV used surplus energy to load the two 1,000 liter buffer tanks.

Even before the photovoltaic system was enlarged, the client Markus Stöger, himself a specialist in high-quality electronics, created the right conditions in his hydraulic heating system for the planned system expansion. For example, by installing two 9 kW screw-in heaters, the subsequent increase in photovoltaic heat generation capacity was already considered from the outset.

With over 35 kWp of installed photovoltaic power, it is now a true solar power plant that naturally provides immense excess power. These surpluses from the photovoltaic system can be used sensibly on site for heat generation thanks to my-PV's solutions, instead of being unprofitably fed into the grid.

In the new 18 kW operating mode, two electric heating elements are supplied with surplus power from the photovoltaic system. One of them can be controlled continuously, the second one is switched on as soon as sufficient surplus is available.

Since both 9 kW heating rods were already available, the effort to upgrade the photovoltaic heating was limited to the installation of a three-pole relay and a minimal adjustment in the wiring. The necessary firmware update for the AC•THOR 9s was simply imported by my-PV via the Internet. All AC•THOR 9s already installed by our customers can also be made suitable for this operating mode by updating the software.

In addition to the surplus detection at the house connection point by means of my-PV Power Meter, Markus Stöger uses (as an optional extra) a second my-PV Power Meter for power measurement at the switched heating rod. Thus, this consumption is also shown in the power display on the display and on the web interface and can also be taken into account in the energy recording of the data logger.

Enormous advantages for the customer

The AC•THOR 9s has been in use in the new operating mode since summer 2021. By mid-November, it had not been necessary to heat up the biomass heating system even once, and this despite the fact that the existing high-temperature heating system with radiators was retained on the first floor during the refurbishment.

The immediate economic benefits are already obvious. The costs for the chimney sweep have been significantly reduced and the storage space required for logs has also been massively reduced. Both in front of the building and inside it. In the future, the family will have an entire basement room at its disposal, once the existing firewood stocks have been used up. Whether this will happen in the coming winter is highly questionable, however, because the heating season for the Stöger family has now been reduced to the months of December and January thanks to photovoltaic heating from my-PV.

Opinion personnelle du client et résumé

In this operating mode, it is expressly recommended that both the AC•THOR 9s control and the power measurement at the switched load are each carried out with a my-PV Power Meter!

Stöger PV Projekt von oben
my-PV PowerMeter
Stoeger PV Projekt 2
my-PV AC THOR 9s
Stoeger PV Projekt
PV Projekt

Weitere Referenzprojekte

A single-family house with many compatibility partners

Maximizing photovoltaic power in combination: This renovated house exemplifies the effectiveness of my-PV's system openness.

lire la suite...

3 photovoltaic modules for hot water

Even a small PV system with 1.4 kWp prepares hot water in the summer with ELWA and thus saves 1 cubic meter of gas every day.

lire la suite...

Swiss family increases self-consumption

In single-family house in the canton of Aargau, the Swiss software manufacturer Solar Manager controls the AC•THOR 9s!

lire la suite...
my-PV Referenzprojekt ELWA Harz PV-Module

Hot water with the sun in Germany

The sun sends no bill: Thanks to ELWA, the sun provides hot water at no cost, even in the German Harz region.

lire la suite...
Referenzprojekt my-PV AC•THOR im netzfernen System

Optimizing off-grid PV systems with the AC•THOR

A British customer enhances his energy independence by optimizing his off-grid PV system with the AC•THOR.

lire la suite...
Referenzprojekt my-PV AC•THOR in Neuenkirchen

Photovoltaic heat during the gas crisis

In a semi-detached house in Münsterland, the AC•THOR from my-PV supports a condensing boiler with the power of the sun.