Drone video - progress of the company building
News about our company's construction progress: a new drone video shows that the first PV modules and the windows have already been integrated into the new building
In the short video clip you can see how quickly the lightweight timber construction has given the building the necessary height. As a result, the interior work and the roof and facade work could also be started quickly. In the meantime, the photovoltaic modules have been mounted on the roof and the windows have been installed in the building.
In the next weeks we will start with the exterior design, the construction of the parking lot (of course without sealing the ground) and the facade will be further covered with photovoltaic modules and wooden parts.
A short inventory can be seen here:
For data protection reasons, the loading of third-party providers requires your consent. More information can be found in our privacy policy.
More articles
References
New feed-in regulations in the Netherlands require a rethink
A Dutch homeowner minimizes feed-in fees by utilizing surplus PV energy to heat water.
Read more...Company
SOL•THOR wins German Design Award 2025
The DC Power Manager SOL •THOR has received the German Design Award in the category “Excellent Product Design”.
Read more...General
Minimizing feed-in costs in the Netherlands
The Netherlands introduced a fee for feeding electricity into the grid. Fees can be reduced by increasing self-consumption.
Read more...