AC•THOR 9s – Operation with 3 single-phase heating elements
Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.
The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.
CAUTION:
This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!
The following instructions from the operating manual are important:
Solution
The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).
Good to know
Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!
More articles
References
Old Irish farm transformed into a solar-powered homeIndependence with the SOL•THOR: autonomous hot water production on a former Irish farm.
Read more...General
Use the energy from your balcony power plant yourself instead of giving it away!Four variants show that in a 2 kWp balcony power plant, heat becomes the key to unlocking its full potential.
Read more...References
Photovoltaic Heat in Two Versions for Hot Water & HeatingA grid-connected and an off-grid PV system in the Black Forest generate hot water and support the heating system.
Read more...