ETHERMA und myPV News
|Support

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Good to know

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

White two-story stucco house with small porch, paved courtyard and outbuildings under a blue sky.

References

Old Irish farm transformed into a solar-powered home

Independence with the SOL•THOR: autonomous hot water production on a former Irish farm.

Read more...
Wood-paneled building facade with a balcony-mounted array of solar panels, two windows and potted plants at the base.

General

Use the energy from your balcony power plant yourself instead of giving it away!

Four variants show that in a 2 kWp balcony power plant, heat becomes the key to unlocking its full potential.

Read more...

References

Photovoltaic Heat in Two Versions for Hot Water & Heating

A grid-connected and an off-grid PV system in the Black Forest generate hot water and support the heating system.

Read more...