ETHERMA und myPV News
|Support

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Good to know

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

Tablet displaying graphs on a desk beside a pen and notebook, with "New Prices effective July 1, 2026" text overlay. Bright office background.

Company

New prices for my-PV products effective July 1, 2026

Due to rising personnel, material and production costs, a price adjustment is required.

Read more...

Company

my-PV accelerates growth: Philipp Baumgartner strengthens international expansion

As new Managing Director Commercial Operations, Philipp Baumgartner will actively drive the internationalization of my-PV.

Read more...
House with beige walls, red roof, and solar panels. Surrounded by greenery, clear sky above.

References

Reduce gas consumption with SOL•THOR

No gas boiler needed: Single-family home in Baden-Württemberg supplied autonomously with photovoltaic heat until mid-November

Read more...