ETHERMA und myPV News
|Support

AC•THOR 9s – Operation with 3 single-phase heating elements

Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.

The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.

CAUTION:

This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!

The following instructions from the operating manual are important:

Solution

The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).

Good to know

Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!

More articles

Company

my-PV accelerates growth: Philipp Baumgartner strengthens international expansion

As new Managing Director Commercial Operations, Philipp Baumgartner will actively drive the internationalization of my-PV.

Read more...
House with beige walls, red roof, and solar panels. Surrounded by greenery, clear sky above.

References

Reduce gas consumption with SOL•THOR

No gas boiler needed: Single-family home in Baden-Württemberg supplied autonomously with photovoltaic heat until mid-November

Read more...
Modern building exterior with large glass windows, surrounded by trees. The pathway is lined with white rectangular tiles.

References

Green energy for Casa Verde

Casa Verde shows how modern architecture, high living comfort, and photovoltaic heat generation work together seamlessly.

Read more...