:quality(75))
AC•THOR 9s – Operation with 3 single-phase heating elements
Our "Support" section offers many practical tips that will help you with the installation and commissioning of our devices.
The load control of 3 single-phase heating elements is a special form of operating mode M1 for hot water.
CAUTION:
This is to be clearly distinguished from operating mode M2 "Layer Charging," where load control is switched to another 3-phase consumer using an external opener and a closer!
The following instructions from the operating manual are important:
:quality(75))
Solution
The regular operation for 3 single-phase heating elements can be set with a single adjustment. Simply switch the "Load Priority" accordingly under "Settings" (gear symbol).
Good to know
Tip: Connect the topmost heating element to the control output OUT-3 of the AC•THOR 9s. If you accidentally did not follow the order, simply switch the consumption plugs. This saves rewiring!
More articles
:quality(75))
Company
New my-PV Setup app simplifies commissioningThe new “my-PV Setup” app detects devices on the local network and simplifies the commissioning of my-PV solutions.
Read more...:quality(75))
Partner
Compatibility with Carlo Gavazzi has been expandedCompatibility with Carlo Gavazzi, a long-standing my-PV partner, now includes additional electricity meters.
Read more...:quality(75))
Partner
my-PV Now Officially Integrated into Home Assistant Coremy-PV is now officially integrated into Home Assistant Core for seamless smart home control of solar-powered heating.
Read more...